Nanomedicine and Biotechnology Laboratory (BIONAND) in PTA – Málaga.

Location:
Malaga, España

Customer:
Centro Andaluz de Nanomedicina y Biotecnología

Status:
Completed 2010

Built surface:

6.792 m²

Condit. surface:

6.085 m²

Global budget:

3.673.699€

Project description

The new Andalusian Laboratory of Nanomedicine and Biotechnology (BIONAND) is a center participated by the Ministry of Health and Social Welfare, the Ministry of Economy, Innovation, Science and Employment, and the University of Malaga. The building has been designed as a multidisciplinary center for research in nanomedicine,. The interaction of different professionals from the healthcare, university and business sectors will generate new systems for diagnosis, prevention and treatment of diseases. For this reason, the building has been equipped with facilities that give answer to scientific-technical needs of the center. The building has got 6792 m2 over three floors, which can give service to 20 research groups, with an open structure of laboratories and rooms that reflects its multidisciplinary aim.

Results

The building interior design responds to the vision of creating open spaces, with the aim of favoring the interrelation between the different groups of researchers and facilitating complementarity and collaboration between the different scientific disciplines. For this, the facilities were also designed with criteria of modularity and flexibility, coexisting the criteria of energy efficiency and operation with the needs of activity in the center.

Services provided

Engineering project and construction management for all the building facilities: HVAC, electricity, plumbing/ drainage, control, communications, gases and fire protection.

Key project team

Call