Location:
Madrid. España
Customer:
Ayuntamiento de Madrid
Status:
Completed 2011
Global budget:
8.120.000€
The Madrid City Council, when preparting their application for celebrating the Olympics Games, decided to create a Universal Accessibility Sports center. It is a building with 23,000m2, four floors above ground for sports facilities for the practice of different specialties by people with disabilities and without them, and on the other hand three floors below ground for swimming pool, garages and several facilities.
Flexibility is the main value of the building, the designed building solves the required requirements with solvency while allowing it to adapt to new requirements. The facilities have been designed by INGHO for its perfect integration with the architecture. It is a project that emphasizes both ventilation and natural lighting, with special emphasis on energy efficiency.
Engineering project for all the building facilities: HVAC, electricity, plumbing/ drainage, control, communications and fire protection.