Energy audits in public buildings (2011)

Location:
Andalusia, Spain

Customer:
Agencia Andaluza de la Energía

Status:
Completed 2012

Global budget:

NA

Project description

The Andalusian Energy Agency has called for a tender to perform energy audits for those public buildings belonging to the Junta de Andalucía that have a relevant energy consumption. INGHO was the winner of this tender, some of the most representative buildings that have been included in the scope of this project are: Infanta Elena Library in Seville, Vargas Ponce Peripheral Specialty Center, Museum of Fine Arts in Seville, High Resolution Hospital of Alcaudete, High Resolution Hospital of Puente Genil (Córdoba), High Resolution Hospital of Sierra Segura.

Results

INGHO had an outstanding performance during the project execution: all the buliding audits included in the scope of the project where done in time and complying with the required quality. Facilities have been analyzed, the historical consumption was reviewed, modeling of the energy behavior of the building in different scenarios, analyzing the impact on consumption of the different possible improvement options, finally energy saving measures were proposed and the technical and economic feasibility was evaluated.

Services provided

Energy audits

Key project team

Call